Queens Wharf by Night

Last week our senior Registered Surveyor Ben Moritz and our Geotechnical Monitoring Analyst and Project Manager, Shane Frischkorn continued with the installing of Monitoring Control Prisms and crack meters for Queens Wharf by Night .

With a great supporting team, Ben and Shane completed the installation of the Monitoring Control Prisms and crack meters located around pivotal areas of the Riverside Expressway and its surroundings over two nights.

Queens Wharf by night gave the team the opportunity to complete the installation with little interruptions to traffic movement across the Riverside Expressway.

A snapshot of the installation of the Monitoring Control Prisms and crack meters during the two nights:

IMG_6952  IMG_6953  Ben installing control prisms  Close up control prisms

Ben with control prism  Shane installing crackmeters  Ben on platform

0 replies

Leave a Reply

Want to join the discussion?
Feel free to contribute!

Leave a Reply

Your email address will not be published. Required fields are marked *